P20 PUMP OPERATION / MAINTENANCE MANUAL

2

INSTALLATION

2.1 UNPACKING

After unpacking, the pump should be checked for any damage that may have occurred
during shipment. Damage should be reported to the carrier immediately.

NOTE: Although extensive efforts are made to deliver pumps to our customers completely
dry, new pumps may contain residual moisture from their final DI water test.

The following items should be included within the shipping container:

Qty

Item

Description

1

1

1

PURUS 20

MP20

PC7

Purus 20 Pump

Manual, Purus 20 pump

PC& Pump Controller (optional)

2.2 UTILITIES / HOOK-UP

The pump is mounted using four ¼

” (6mm) bolts. It is recommended that the pump be

positioned within 15° from level to maintain self-priming ability and pumping efficiency.
Allow sufficient room for tubing connectors.

Figure 2-1: Dimensions (with mounted PC7 option & flare connection)