Gas connections, Installing and purging the gas regulator – VICI D-4-I-TQI-R User Manual

Page 8

Advertising
background image

7

Installation

GAS CHROMATOGRAPH

TEE
(ZT1)

HELIUM

PURIFIER

DISCHARGE GAS
(99.999% He)

TGA-R-30F60P

RESTRICTOR

(30 mL/min minimum)

VENT

COLUMN

INLET

DISCHARGE GAS
INLET

VENT

COLUMN

EPC

HPM

ELECTRONIC
PNEUMATIC
CONTROL

VICI
MINIATURE
HELIUM
PURIFER
(recommended)

SAMPLE IN

(or blank)

Figure 4: Gas connections for a D-4-I-TQ-R system

Gas Connections

Remember these three points discussed earlier: (1) all surfaces that contact
the gas stream must be fused silica or stainless steel; (2) do not use copper
tubing or brass fittings; and (3) all tubes must be thoroughly cleaned and
baked before use. The installation instructions below assume that the
detector discharge gas will be supplied from a nearby cylinder of helium
of the proper purity. If your installation is different, you may need to modify
the instructions appropriately. A number of Valco fittings have been supplied
in the fittings kit to handle different situations.

Figure 4 illustrates gas connections for the D-4-I-TQ-R detector system.
Since the distance from the helium supply to the GC varies from installation
to installation, we do not supply tubing for that purpose.

Installing and Purging the Gas Regulator

1. Make sure the on/off valve on the helium cylinder is completely closed.

Screw the CGA fitting nut of the regulator into the helium cylinder. Go
beyond finger-tight, but do not tighten the nut all the way – some leakage
is required for the purging operation.

2. Turn the output pressure regulating knob completely counterclockwise.

3. Open the cylinder on/off valve

slightly and quickly close it again.

4. Adjust the tightness of the regulator connecting nut to allow a pressure

reduction of ~690 kPa/sec (100 psi/sec). With a new bottle, the gauge
should start out at about 14 MPa (2000 psi).

5. When the pressure drops into the 1.4 - 3.4 MPa (200 - 500 psi) range,

open the cylinder on/off valve slightly and quickly close it again.

6. Repeat Step 5 eight or ten times to be certain that all the air is purged.

On the final purge, tighten the regulator connecting nut very securely as
the pressure approaches the 2.1 - 3.4 MPa (300 - 500 psi) range.

Advertising
This manual is related to the following products: