Assembly, Tube / flight extensions, Caution – Wheatheart Galvanized Utility Auger User Manual

Page 13

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGERS

3. A

SSEMBLY

U

TILITY

3.1. T

UBE

/ F

LIGHT

E

XTENSIONS

30644 R1

13

3. Assembly

Before beginning assembly, familiarize yourself with all the sub-assemblies and
hardware making up the auger. Have all parts on hand and arrange them for
easy access. Carry out assembly in a large open area with a level surface.

Important:

Always have 2 or more people assembling the equipment. Because of the
weight, do not attempt assembly alone.

Augers are available in various combinations. In most cases, the following
instructions will apply to all augers. Where the assembly information varies,
additional instructions will be included and will be indicated with an arrow.

3.1. TUBE / FLIGHT EXTENSIONS

1. Position tube sections. Align tube sections on a flat surface or on a series of

benches.

Note:

When assembling more than 2 sections,
start from spout end and work towards
hopper.

2. Screw or slide lower flight shaft onto

upper flight shaft until flight ends butt
together and flighting spiral matches
up. Secure with hardware listed in
table below. Repeat, if necessary, for
any remaining flight shafts.

3. Slide

tube

sections together and secure.

4. Place the tube connectors onto the tubes with tube joint in the center of the

connectors.

• Fasten tube connectors together with twelve 7/16” x 1" bolts and whiznuts

and tighten securely (Figure 3.2).

Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.

CAUTION

Block tube sections to prevent rolling. Do not
drop. Damage to equipment or personal injury
will result.

Auger

Hardware

Amt.

8”

7/16” x 2-1/4”

2

10”

1/2” x 2-3/4”

2

Figure 3.1

Advertising