Modifying the start/end time, Control bar, Interval – ADS Environmental Services PrimeWorks QR 775018 A0 User Manual

Page 70: Save data, Units

Advertising
background image

ADS PrimeWorks User Manual

64

Select the appropriate date from the date selection dialog. If necessary, scroll to
another month and/or year using the right and left arrow buttons. Select today’s
date by clicking on Today: [current date] at the bottom of the dialog.

Repeat this process for the other end of the date range as necessary.

Modifying the Start/End Time

Modify the time in the Start or End field by highlighting the hour and/or
minute in the corresponding field and then entering the desired value.

Repeat this process for the other end of the time range as necessary.

The selected start and end time apply only to the data being plotted. Based on
the selected values, the time axis may autoscale to show a slightly larger
timescale.

Control Bar

The control bar displays below the Legend at the bottom of the graph.

Control bar

Note: The Interval field and Save Data button are available only
when graphing data derived from event data.

Interval

Select the interval from the drop-down list over which to average the event
data.

Save Data

Click on this button to save the data after changing items on the graph.

Units

Designate the units of measure to use for the data on the graph from this drop-
down list.

Units drop-down list

Advertising