Applying power to the chassis, Applying power to the chassis -29, Installation – Carrier Access BROADway System 770-0125-AB User Manual

Page 45: Danger

Advertising
background image

BROADway - Release 4.00

2-29

Installation

Applying Power to the Chassis

Applying Power to the Chassis

Locate the power switches on the rear of the chassis (O/I) and turn them on (I). After powering up the
BROADway chassis, all the LEDs will go through an initialization process where they all light. After
the cards have initialized, only the top left (MODULE) green LED on each card and one of the NSP101
ACTIVE LEDs will lamp as shown in the following figure. After the standby NSP101 has
synchronized its database with the active NSP101, its ACTIVE LED will link green slowly. These
LEDs remain lit during normal operation.

Slots that have no cards installed will remain unlit.

DANGER!

T

HIS

SYSTEM

HAS

TWO

POWER

INPUT

CONNECTIONS

. D

ISCONNECT

BOTH

BEFORE

SERVICING

TO

AVOID

ELECTRIC

SHOCK

. S

EE

C

ABLING

P

OWER

AND

G

ROUND

ON

PAGE

2-6.

Should you need to power cycle the BROADway system then power down the chassis using the power
switches at the rear of the chassis (O/I) and wait at least five seconds before powering it back on.

9

INTERFACE

MO

DU

LE

1 3

A

C

TI

V

E

A

LA

R

M

MO

DU

LE

A

C

TI

V

E

3

1

7

5

INTERFACE

S

U

M

1 3

TM

2

13

11

15

1

P

W

R

1

E

TH

2

MO

DU

LE

IN

TE

RF

AC

E

B

R

O

A

D

w

a

y

NIP TX1

NIP TX2

TX1

TX2

TX3

TX4

NIP RX1

NIP RX2

RX3

RX1

RX2

RX4

SCP-2

ALARMS

RESET

SCP-1

OSP-1

BSP-3

BSP-2

BSP-1

BSP-4

OSP-2

OSP-3

OSP-4

NIP-5

NSP-1

NSP-2

NIP-6

NIP-7

NIP-8

NIP-1

NIP-2

NIP-3

NIP-4

UIP-2

UIP-1

Advertising