FASS T F14 200G User Manual

Page 12

Advertising
background image

D.

Secure PFB-2002 and RS-2001 with (1) hex bolt

1/2” -20 x 1 1/2” and (1) 1/2” washer to PFB-2002C

C.

Insert PFB-2002C in to bed channel align the nut with the opening on the channel.

.

E.

Route FASS wire harness/wire extension along the frame rail to factory lift pump. Remove the power
lead from the factory lift pump. Be sure to finish connecting wire harness before mounting into
position.

Advertising