High voltage battery – FORD 2015 Fusion Hybrid User Manual

Page 175

Advertising
background image

Charge (green light) — indicates status
of charging:

No light means you have not connected
the cord to the vehicle.

Blinking light means that the charging
is in process.

Solid light means you have connected
the cord, but the vehicle is not charging.

Fault (red triangle light) — Lights up in
case of a detected failure. No charging is
possible:

Blinking red triangle light – means that
the 120 volt convenience cord is trying
to reset the failure and could restart
the charging cycle.

Solid red triangle light – means that
the fault is permanent. You need to
unplug the cord and then plug it back
in to reset the fault. If the fault persists,
contact an authorized dealer.

Charge Port

The charge port is located between the
front left side door and front left wheel
well. There is an indentation located on
the charge port door. Press with your
thumb to press to open and close the door.

E144779

Note: Do not force the charge port door
open or closed. Forcing the door open or
closed will damage the charge port.

The light ring located around the charge
port indicates the charge status of the high
voltage battery in your vehicle. Divided into
four quadrants, the charge port light ring
displays the state of charge in 25 percent
increments.

There is a cord acknowledgment feature
that activates when you initiate a charge
cycle. The four light quadrants will each
individually flash clockwise starting with
the top right light and ending with the top
left, two full times, confirming the system
detects the charging coupler.

Use the key fob to view the charge status
of your vehicle at any time by pressing the
unlock button. The light ring will light up
the corresponding quadrant(s) so that the
current state of charge can be determined.
If the charge is below 25 percent, the light
ring will not light. Do not forget to press the
lock button on your key fob to re-lock your
vehicle.

The light ring will also display the current
state of charge when opening the doors.

Charging

Note: Your vehicle must be in park P to
charge.

To charge the high-voltage battery:

1.

Put the vehicle in park P and power
down the vehicle.

2. With your thumb, press in and release

the indentation located on the charge
port door and the door will rotate open.

3. Plug the charging coupler into the

charge port receptacle on your vehicle.
Make sure the button clicks confirming
that you have completely engaged the
coupler.

172

Fusion/Mondeo (CC7), enUSA

High Voltage Battery

Advertising