2 preparation items, 2.2 daily inspection, 2.2. daily inspection – NISSAN 2013 LEAF - Roadside Assistance Guide User Manual

Page 33

Advertising
background image

5-2 Preparation Items

Preparation Items

Specification

Purpose

Personal Protective Equip-
ment (PPE):
Insulated gloves

Up to 1,000V

For protection from high voltage elec-
trical shock

Insulated shoes

Safety shield

Wrenches

Size:10mm

To remove the service plug access
cover bolts.

To remove the 12V battery terminal bolt.

Solvent resistant protection
gloves

To utilize in the event of a Li-ion bat-
tery electrolytic solution leak.

Solvent resistant protection
shoes

Absorbent pad

The same pad used for internal
combustion engine fluids can be
used.

To absorb any Li-ion battery electro-
lytic solution leakage.

Standard fire fighting equip-
ment

Standard fire fighting equipment
Depending on type of fire (vehicle
or battery) use standard fire
fighting equipment (water or
extinguisher).

To extinguish a fire.

Insulated tape

Insulating

To cover any damaged harnesses to
protect from and prevent electrical
shock. Tape should cover all bare or
damaged wire.

5-2.1 Personal Protective Equipment (PPE) Protective Wear Control

Perform an inspection of the Personal Protective Equipment (PPE) items before beginning work. Do not use
any damaged PPE items.

5-2.2 Daily Inspection

This inspection is performed before and after use. The worker who will be using the items should perform
the inspection and check for deterioration and damage.

• Insulated rubber gloves should be inspected for scratches, holes and tears. (Visual check and air

leakage test)

• Insulated safety boots should be inspected for holes, damage, nails, metal pieces, wear or other

problems on the soles. (Visual check)

• Insulated rubber sheet should be inspected for tears. (Visual check)

33

Advertising