NISSAN 2014 Pathfinder Hybrid - First Responder's Guide User Manual

Page 26

Advertising
background image

5. Remove traction motor inverter cover (1).

6. Disconnect negative (-) battery cable and cover it with

insulated tape.

7. Wait approximately ten (10) minutes for complete

discharge of the high voltage capacitor after the fuse
panel and battery cable have been disconnected.

8. Perform the first response action.

1

AAYIA0273ZZ

AAYIA0274ZZ

FRG–26

Advertising