Set the lock/bipart delay – Chamberlain RESIDENTIAL GATE OPERATOR GA420D User Manual

Page 25

Advertising
background image

Occasionally in dual gate installations, one gate would need to open first and close second. This would happen if there
was an ornamental overhang on one gate or if using a solenoid lock, for example. This gate is called the Primary gate
and needs to be connected to Gate 1 connections on the control board. Thus, it is preferred that the control box be
installed on the same side as this gate. If there is no appropriate location on that side for the control box, then mount the
control box on the opposite side, but connect the operator closest to the control box to the Gate 2 connector and the
operator on the opposite side to the Gate 1 connector.

Set the Lock/Bipart Delay

The LOCK/BIPART DELAY switch on the control board
needs to be set to the ON position.

The following illustration shows a dual gate configuration
with a decorative overlapping piece on the outside of the
gate.

Control Box

18

18

R93

R93

D42

D42

K2K2

D1

D1Ø

Z22Z22

P1P1

F2F2

MO

V1

M

O

V

1

D1D1

Q12Q

12

U4

U4

D129

D129

Z4

Z4

U3U3

D2

D2

D44

D44

C11C11

C13

C13

D16D16

F9F9

R1

R1Ø1

R1

R1ШШ

ШШ

K1K1

Q22

Q22

F3

F3

K3K3

K4K4

R196

R196

F1

F1

Z12

Z12

GATE 2

GATE 2

GR

GR

WH

WH

YL

YL

BL

BL

RD

RD

BR

BR

F7

F7

24V

24V

GATE 2

GATE 2

SET

SET

OPEN

OPEN
LIMIT

LIMIT

SET

SET

CLOSE

CLOSE

LIMIT

LIMIT

LEARN

LEARN
LIMITS

LIMITS

GATE 1

GATE 1

C69C69

J2J2
Ø

D8D8

D4D4

R9R9

R329R32

9

R27R27

MO

V2

MO

V2

R4R4

C2C

2

Z1

Z1

R2

R2

K5K5

F12

F12

Q9Q

9

R9

R9Ø

F8

F8

Q6Q6

Q1Q

1

C75

C75

C73

C73

C72

C72

C71

C71

C7

C7Ø

C66

C66

C65

C65

C68C68

C33C33

F11F11

R42

R42Ø
R423

R423

J24 J23 3J24

J2
3

3
Ø

A 32VA
32V

3 3

Ø

A 32VA

32V

J21J21

3030

3030

C64C64

R22

R22

U2

U2

J18J18

K6

K6

JU1JU1

JU2

JU2

DB1

DB1

D36

D36

C71

C7Ø

ON

OFF

LOCK/
BIPART DELAY

18

R93

D42

K2

D1Ø

Z22

P1

F2

M

O

V

1

D1

Q12

U4

D129

Z4

U

3

D2

D44

C11

C13

D16

F9

R1Ø1

R1ØØ

K1

Q22

F3

K3

K4

R196

F1

Z12

GATE 2

GR

WH

YL

BL

RD

BR

F7

24V

GATE 2

SET

OPEN
LIMIT

SET

CLOSE

LIMIT

LEARN
LIMITS

GATE 1

C69

J2
Ø

D8

D4

R9

R329

R27

MO

V2

R4

C2

Z1

R2

K5

F12

Q9

R9Ø

F8

Q6

Q1

C75

C73

C72

C71

C7Ø

C66

C65

C68

C33

F11

R42Ø
R423

J2
4


J2
3

3
Ø

A

32V

3

Ø

A

32V

J2
1

30

30

C64

R22

U2

J1
8

K6

JU1

JU2

DB1

D36

18

R93

D42

K2

D1Ø

Z22

P1

F2

M

O

V

1

D1

Q12

U4

D129

Z4

U

3

D2

D44

C11

C13

D16

F9

R1Ø1

R1ØØ

K1

Q22

F3

K3

K4

R196

F1

Z12

GATE 2

GR

WH

YL

BL

RD

BR

F7

24V

GATE 2

SET

OPEN
LIMIT

SET

CLOSE

LIMIT

LEARN
LIMITS

GATE 1

C69

J2
Ø

D8

D4

R9

R329

R27

MO

V2

R4

C2

Z1

R2

K5

F12

Q9

R9Ø

F8

Q6

Q1

C75

C73

C72

C71

C7Ø

C66

C65

C68

C33

F11

R42Ø
R423

J2
4


J2
3

3
Ø

A

32V

3

Ø

A

32V

J2
1

30

30

C64

R22

U2

J1
8

K6

JU1

JU2

DB1

D36

Primary Gate - Connect to Gate 1 Connector on Control
Board.

Primary Gate

If a solenoid lock is being used on a gate, the gate with
the lock attached to it would be the primary gate.

Connect Gate Operator (Gate 2) to Control Box (Model GA420D Only)

25

Wiring

Outside Property

Outside Property

Advertising
This manual is related to the following products: