2 junction box, Junction box – Chamberlain RESIDENTIAL GATE OPERATOR GA420D User Manual

Page 27

Advertising
background image

27

Wiring

Junction Box

The following items are required to complete the junction box (not provided) installation:

• 4 x 4 Junction Box with 3/4 NPT threaded port holes

• Screws

• PVC Conduit

Open the junction box by removing screws (4) and set aside.

Mount the junction box within 5' of second operator.

2

Mov

ing

Ga

te C

an

Cau

se

Inj

ury

or

Dea

th

KE

EP

CLEA

R!

Gat

e m

ay m

ove

at a

ny

tim

e w

itho

ut p

rior

wa

rnin

g.

Do

not

let

ch

ildr

en

ope

rate

the

ga

te o

r

pla

y in

the

ga

te a

rea

.

Thi

s e

ntran

ce

is f

or ve

hicl

es

onl

y

Ped

est

rian

s m

ust

us

e se

par

ate

ent

ran

ce

Screws (4)

Junction Box
(not provided)

Junction Box Cover

Within 5'

Control Box

Gate Operator (Gate 2)

Gate Operator (Gate 1)

Junction Box

Extension Cable

Within 5' PVC conduit (not provided) to
protect the power cable and low voltage wire
from lawn mowers and string trimmers.

Advertising
This manual is related to the following products: