Initiate switching primary dlci over to its backup, Initiate switching dlci back to the primary – Cabletron Systems 1800 User Manual
Page 298
Advertising

19-16
SmartSwitch 1800 4. 0 User G uide, Rev 01
Initiating Frame Relay Backup Switchover/Switchback
Frame Relay backup DLCIs can be configured (as described in
) to automat-
ically become operational a set time after failure of a primary DLCI, and to switch
back to the primary a set time after the primary becomes operational again. These
automatic settings can be overridden via Frame Relay Backup Operations (
[B], [J]
from the Main Menu).
From the Frame Relay Backup Operations Menu:
●
To switch from a primary to one of its backups, press
[A]
.
●
To switch from a backup to a primary, press
[B]
.
In either case, enter (as prompted) the requested information to identify the primary
and backup.
Advertising