Assembly configurations, Caution, Assembly – Craftsman 987.799601 User Manual

Page 9

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY

ASSEMBLY CONFIGURATIONS

Your machine has been partialiy assembled at the

factory. The remaining assembly steps should be done

on a clean, level surface. Choose the mode of operation

from the pictures below and then go to the page for

assembly of the chlpper/vac in the desired configuration,

Wmi

CAUTION

To prevent persona! injury or property damage, do not

conneot the spark plug or star! the engine until al!
assembly steps are complete and you have read and

understood the safety and operating instructians in
this Manual.

Walk-behind vacuuming - see Page 10

WALK-SEHiND VACUUMING

OPERATION CHECKLIST

✓ Collection bag installed and zipped.

✓ Baffle plate off (provided with

optional vacuum hose kit only)

✓ Vacuum inlet cap installed.

i/

Handlebars positioned toward the

rear of the machine.

Blower operation»see Page 12

BLOWER OPERATION CHECKUST

✓ Handlebars positioned toward the

front of the machine.

\/

Collection bag removed-

✓ Blower deflector installed,

✓ Vacuum inlet cap installed.

✓ Baffle plate off (provided with

optional vacuum hose kit only)

CHiPPER OPERATION CHECKLIST

✓ Handlebars positioned toward the rear of

the machine.

✓ Collection bag installed and zipped.

Blower deflector and baffle plate (optional)
off.

✓ Vacuum inlet cap installed.

Using the vacuum hose (optional) - see Page 14

VACUUM HOSE OPERATION CHECKUST

✓ Handlebars positioned toward the rear of the

machine

✓ Collection bag Installed and zipped.

✓ Baffle plate on

✓ Vacuum hose installed.

Advertising