Assembly configurations, Caution, Assembly – Craftsman 987.799601 User Manual
Page 9
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
ASSEMBLY
ASSEMBLY CONFIGURATIONS
Your machine has been partialiy assembled at the
factory. The remaining assembly steps should be done
on a clean, level surface. Choose the mode of operation
from the pictures below and then go to the page for
assembly of the chlpper/vac in the desired configuration,
Wmi
CAUTION
To prevent persona! injury or property damage, do not
conneot the spark plug or star! the engine until al!
assembly steps are complete and you have read and
understood the safety and operating instructians in
this Manual.
Walk-behind vacuuming - see Page 10
WALK-SEHiND VACUUMING
OPERATION CHECKLIST
✓ Collection bag installed and zipped.
✓ Baffle plate off (provided with
optional vacuum hose kit only)
✓ Vacuum inlet cap installed.
i/
Handlebars positioned toward the
rear of the machine.
Blower operation»see Page 12
BLOWER OPERATION CHECKUST
✓ Handlebars positioned toward the
front of the machine.
\/
Collection bag removed-
✓ Blower deflector installed,
✓ Vacuum inlet cap installed.
✓ Baffle plate off (provided with
optional vacuum hose kit only)
CHiPPER OPERATION CHECKLIST
✓ Handlebars positioned toward the rear of
the machine.
✓ Collection bag installed and zipped.
Blower deflector and baffle plate (optional)
off.
✓ Vacuum inlet cap installed.
Using the vacuum hose (optional) - see Page 14
VACUUM HOSE OPERATION CHECKUST
✓ Handlebars positioned toward the rear of the
machine
✓ Collection bag Installed and zipped.
✓ Baffle plate on
✓ Vacuum hose installed.