Alumax P-DRC1Y User Manual

Page 26

Advertising
background image

26

THRESHOLD INSTALLATION

13

COUPER SELON L’OUVERTURE

AVEC UNE SCIE À MAIN

SILICONE

14

HOURS

Cut the threshold (13) to the necessary

opening ensuring optimal water retention.

Proceed to applying a bead of silicone to

the underside of the threshold and placing it

on the threshold of the base.

S

13

13

13

Apply silicone (S) between the bottom of the

xed panel and the threshold of the base. This

is done from the outside of the shower area.

Advertising