Alumax W2 CRP User Manual

Page 7

Advertising
background image

3a

INSTRUCTION MANUAL

7

3c

3a

3b

3

WALL JAMB INSTALLATION

Place the wall jambs centered on the line marked

previously on the threshold in the recommended area

for the shower door instalation and align them

by using a level.

Mark the four holes on to the wall on both sides.

Remove the wall jambs.

Drill the holes in the wall with Ø1/4’’ drill bit intented for

ceramic tiling .

1

1

3b

3c

Advertising