Installation and calibration – Salter Brecknell SBI-505 User Manual

Page 4

Advertising
background image

2

Installation and calibration

Power supply connection

The indicator is powered by A/C adapter that plugs directly into the

“DC” pin at the bottom of the indicator.

Connection of load cell and indicator

The indicator can be connected up to 6 load cell of 350Ω, 4 wire or 6
wire load cell both ok.

Quick disconnect, as below:










PC Board connection





-EXC -IN GND +IN +EXC -EXC

Advertising
This manual is related to the following products: