Salter Brecknell MS-50M User Manual

Page 2

Advertising
background image

2

I.

Pillar Installation (Fig.2):


1. Upright insert the pillar to the bracket on frame
2. Use the screws and washer to fix the pillar in a vertical position

II.

Connect the steelyard rod to long lever (Fig.3):

1. Lay the pillar on a table (Fig.3)
2. Disassemble the wires on the levers.
3. Insert the wrench to the small hole in front of the steelyard rod, and pull the

hook of steelyard rod with the hook of wrench (Fig. 3-1)

4. Push the long lever frontward, then hook the bearing of the steelyard rod on the

pivot of the long lever (Fig. 3-2)

Advertising