BoonDocker POLARIS: Non-turbo Control Box 2013 PRO 800 Installation User Manual
Page 3
                                    Advertising
                                    
                                        
                                    
                                
                                 
Note: When installing the connectors, be absolutely sure the wire colors match the description in 
Step1. Also verify the open position (G) on the control box matches the open position (G) on the stock 
connectors. 
3. Connect the Ground wire to the factory ground located on the Chassis in front of the ECU
location.
Note: The Black/Blue and Yellow/White wire with the 2 position connector can be used to hook up a 
9V battery to power the control box on without having to start the sled. This connector can also be used 
to run an accessory button. Refer to the operation instructions for more information. 
More instructions will be available on our w
at a later date.
                                    Advertising