Dynojet 250i: Control Panel Interface Upgrade (S/N 202xxxx) User Manual
Page 22
Advertising

20
45. The battery cables and starter cables need to be connected next. The 4 pin connector plugs into the
back side of the Control Panel Interface board near the middle of the board to P2. The cable routes
out of the back of the Power Distribution assembly as shown.
46. Install the starter support bracket, if necessary, and connect the other end of the battery cables to the
starter as shown.
P2
Battery to Control
Panel Interface
cable
Route
here and
cable tie
Advertising
This manual is related to the following products: