EFCO S5500 Inside Glazed User Manual
Page 31

EFCO CORPORATION 6/2012
PART NO. Y552
Series 5500 Inside Glazed Installation Instructions
STEP #1 INSTALL DRIVE-IN GASKETS IN VERTICAL MULLIONS
A. Remove the exterior drive-in wedge gasket material from the reel, and allow the gasket to
relax and shrink.
B. Remove any temporary retainer gaskets previously applied, from the opening at hand.
C. The exterior vertical gaskets must be cut vertical D.L.O. plus 1 3/4”. Apply the drive-in gas-
kets at the vertical mullions by driving in the wedge gasket, starting at the center of the
D.L.O. Crowd in the excess at the ends. Care should be taken not to stretch the gasket when
installing. The vertical gaskets should run through and extend past the horizontal gaskets,
once the horizontal gaskets are in place.
INTERIOR VIEW
Apply drive-in wedge
gaskets at verticals (cut
D.L.O. plus 1 3/4”).
Section VI: Interior Drive-In Gasket & Glazing Bead
Installation