EFCO S5500 Outside Glazed User Manual
Page 15

EFCO CORPORATION 6/2012
PART NO. Y550
Series 5500 Outside Glazed Installation Instructions
STEP #5 INSTALL FRAME COMPONENTS
A. Set the last frame in the run into the opening mating the filler with the intermediate verti-
cal until the filler and vertical snap together.
B. When the frame is set level and plumb, apply the dead load shims below the verticals, and
apply anchors as shown on pages 11 and 12, step 2 (B).
C. Snap-in head and sill fillers.
D. Refer to Sections IV and V for Glazing Preparation and Glazing Installation.
Apply dead load
shims at anchors
and below verticals.
IMPORTANT NOTE:
It is critical to allow at least a 3/4” space between the perimeter of the jamb mullion
and the condition for setting space for the last frame unit to be installed.
Section III: Typical Anchorage Methods