EFCO 8800 Series Assembly Instructions Vol.4 User Manual
Page 23
Advertising

EFCO 2009
Page 23
Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 4
Section 13 - Outside 90° Corner Captured Unit Glazing : A. Temporary Glazing Locators
Figure 41
1. Apply two temporary glazing locators (KV03 AND KV04) with isolators and setting blocks at quarter points at the sill and intermediate horizontal locations.
2. Refer to Volume 2, page 20 of the S-8000 Unitized Curtain Wall Assembly Instructions for assembly details and notes.
Temporary Glazing
Locators (KV03)
Temporary Glazing
Locators (KV04)
HEAD
SILL
KV03
KV04
Advertising
This manual is related to the following products: