0 indicator set up, 1 starting the indicator setup, 2 setting the load units – Rice Lake Combination System - Precision Loads PL9710 Indicator User Manual
Page 8: 3 setting the grad size, 4 setting net, gross or test mode, 5 converting channels, Indicator set up, Starting the indicator setup, Setting the load units, Setting the grad size
Advertising

Advertising
This manual is related to the following products: