0 ranger 7 simulator operation, 1 standard operation, 1 switches – Rice Lake Simulators User Manual
Page 10: 2 toggle switch load control, 3 exc leds, 4 to simulate a larger load, Ranger 7 simulator operation, Switches, Toggle switch load control, To simulate a larger load
Advertising
This manual is related to the following products: