Power Up Sequence in DDR II SRAM

DDR II SRAMs must be powered up and initialized in a

predefined manner to prevent undefined operations.

Power Up Sequence

Apply power and drive DOFF either HIGH or LOW (all other

inputs can be HIGH or LOW).

Apply V

DD

before V

DDQ

.

Apply V

DDQ

before V

REF

or at the same time as V

REF

.

Drive DOFF HIGH.

Provide stable DOFF (HIGH), power, and clock (K, K) for 1024

cycles to lock the DLL.

DLL Constraints

DLL uses K clock as its synchronizing input. The input must

have low phase jitter, which is specified as t

KC Var

.

The DLL functions at frequencies down to 120 MHz.

If the input clock is unstable and the DLL is enabled, then the

DLL may lock onto an incorrect frequency, causing unstable

SRAM behavior. To avoid this, provide1024 cycles stable clock

to relock to the desired clock frequency.

Figure 3. Power Up Waveforms

> 1024 Stable clock

Start Normal

Operation

DOFF

Stable (< +/- 0.1V DC per 50ns )

Fix High (or tie to VDDQ)

K

K

DDQ

DD

V

V

/

DDQ

DD

V

V

/

Clock Start (Clock Starts after Stable)

DDQ

DD

V

V

/

~ ~

~~

Unstable Clock