Bradford White U-PDX-75S-55FR-3N User Manual

Page 24

Advertising
background image

24

Venting continued-

TABLE 3

3” (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR

LOW GROUND CLEARANCE INSTALLATIONS

Terminating

# of Elbows

(excl. vent term.)

Max Straight

Length ft (m)

Min

straight

Length

ft (m)

48,65

gal.

75 gal.

(2) 90

 Elbows with (1)

90

 Elbow

1

40

(12.2)

30 (9.1)

5 (1.5)

(2) 90

 Elbows with (1)

90

 Elbow

2

35

(10.7)

25 (7.6)

5 (1.5)

(2) 90

 Elbows with (1)

90

 Elbow

3

30 (9.1) 20

(6.1)

5 (1.5)

(2) 90

 Elbows with (1)

90

 Elbow

4

25 (7.6) 15

(4.6)

5 (1.5)

TABLE 4

4” (10.2 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR

LOW GROUND CLEARANCE INSTALLATIONS

Terminating (Reduce 4”

to 3”) (Reduce 10.1 cm

to 7.6 cm)

# of Elbows

(excl. vent

term.)

Max straight
Length
ft (m)

Min

straight

Length

ft (m)

48,65

gal.

75 gal.

(2) 90

 Elbows with (1) 90

Elbow

1

85

(25.9)

75

(22.9)

10 (3.1)

(2) 90

 Elbows with (1) 90

Elbow

2

80

(24.4)

70

(21.3)

10 (3.1)

(2) 90

 Elbows with (1) 90

Elbow

3

75

(22.9)

65

(19.8)

10 (3.1)

(2) 90

 Elbows with (1) 90

Elbow

4

70

(21.3)

60
(18.3)

10 (3.1)

(2) 90

 Elbows with (1) 90

Elbow

5

65

(19.8)

55
(16.8)

10 (3.1)


HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,500
FEET (762 m)
ABOVE SEA LEVEL

The capacity of the induced draft blower declines with increasing altitude due to
a reduction in the air density. In order to assure safe and reliable performance
of the water heater, contact the supplier for high altitude kit.

Advertising