Installation guidelines – Waterworks Easton Vintage Exposed Tub Filler with Cross Handles and Handshower with White Porcelain Lever Diverter and White Porcelain Lever Handles User Manual
Page 2

Easton
®
Exposed Tub Filler
Easton
®
Wall Unions
11.Thread one end of the hose (5) onto the vacuum breaker
(13) and then thread the other end onto the hand shower
(7-10), making sure a
1
/
2
" washer (6,14) is included at both
connection points. Note a combination check valve with
flow restrictor is located inside the base of the hand shower
(7a).
12. Rotate the diverter lever (39-42) to the left and then turn
the hot and cold water on to flush the lines through the
spout. Rotate the lever to the left and right to make sure
water is diverting properly between the spout and hand
shower.
13. As always, check for leaks at all connections.
14.Install the indices marked "hot" and "cold" onto the proper
handle using the double sided adhesive pads.
15.To service a valve stem (29), loosen the handle cover (30)
and then remove the handle assembly (30-32).
➢ If further assistance is required, please contact Product
Support at 1-800-927-2120 (8am-7pm EST).
Installation Guidelines
W A T E R W O R K S
®
These guidelines have been prepared for the professional contractor to aid in the installation of:
EASTON
®
EXPOSED TUB FILLER (EATU21,22-K,24-K,25-K,31,32-K,34-K,35-K)
EASTON
®
WALL UNIONS (EATU18)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
12/03