Power up sequence in qdr-ii+ sram, Power up sequence, Dll constraints – Cypress CY7C1143V18 User Manual

Page 20: Power up waveforms

Advertising
background image

CY7C1141V18, CY7C1156V18
CY7C1143V18, CY7C1145V18

Document Number: 001-06583 Rev. *D

Page 20 of 28

Power Up Sequence in QDR-II+ SRAM

During Power Up, when the DOFF is tied HIGH, the DLL gets
locked after 2048 cycles of stable clock. QDR-II+ SRAMs must
be powered up and initialized in a predefined manner to prevent
undefined operations.

Power Up Sequence

Apply power with DOFF tied HIGH (all other inputs can be HIGH
or LOW)

Apply V

DD

before V

DDQ

Apply V

DDQ

before V

REF

or at the same time as V

REF

Provide stable power and clock (K, K) for 2048 cycles to lock
the DLL

DLL Constraints

DLL uses K clock as its synchronizing input. The input must
have low phase jitter, which is specified as t

KC Var

.

The DLL functions at frequencies down to 120 MHz.

If the input clock is unstable and the DLL is enabled, then the
DLL may lock onto an incorrect frequency, causing unstable
SRAM behavior. To avoid this, provide 2048 cycles stable clock
to relock to the desired clock frequency.

Power Up Waveforms

Figure 5. Power Up Waveforms

K

K

Fix HIGH (tie to VDDQ)

VDD/VDDQ

DOFF

Clock Start (Clock Starts after VDD/VDDQ is Stable)

Unstable Clock

> 2048 Stable Clock

Start Normal
Operation

~ ~

~ ~

VDD/VDDQ Stable (< + 0.1V DC per 50 ns)

[+] Feedback

[+] Feedback

Advertising
This manual is related to the following products: