Planning & preparation, Fit hanger to tilt brackets, Marking wall for drill points – AVF Group ZML2401: Flat & Tilt TV Mount for ANY WALL User Manual
Page 11
Advertising

Planning & Preparation
Determine the wall type that you have (i.e. Brick/Stud/Plasterboard/Sheetrock).
Ensure the drilling area is free from mains services (Gas/Electric/Water).
Drill two 3mm diameter pilot holes to verify the wall type and select the appropriate fixings
(See Section 15).
14
Fit Hanger to Tilt Brackets
Attach Hanger (B) to Tilt Brackets (Q).
12
F
13
F
13
B
Q
Q
Use the Wall Bracket (A) as a template
and position it on your wall. Ensure the
bracket lines up with the line you have
previously drawn and mark the two
DRILL POINTS with a pencil.
Drill point
A
Decide the position of your wall bracket
and using a pencil lightly draw a straight,
level line approx 220mm long.
approx
220mm
Pencil Line
Drill point
Marking Wall For Drill Points
13
Advertising