California Faucets Rough for Floor Mount Tub Filler User Manual

Page 4

Advertising
background image

9516_ii_140613

Pg

4

6

FINISHED FLOORING (on concrete)

Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.

• Pour concrete FILLER (15) around

MUDGUARD❶ encasing PLATE❻ and filling to
surrounding CONCRETE⓮

• Apply top floor COVERING⓭ (e.g. tile, stone,

etc…) onto concrete FILLER (15) and surrounding
CONRETE⓮

• Finished floor COVERING⓭ must fall between the

MIN/MAX marks on MUDGAURD❶ for proper

installation of Floor Mounted Tub Filler Faucet














www.californiafaucets.com 5271 Argosy Ave. Huntington Beach, CA 92649 800-822-8855

Ø

1-5/16 to 1-1/2”

7”

Ø

1-5/16 to 1-1/2”

7”

Advertising