Other test stands by mark-10, Unpacking and setting up, List of included items – Checkline ES20 User Manual

Page 3

Advertising
background image

Models ES10 & ES20

5

OTHER TEST STANDS BY MARK-10

TST

TSB

TSA

TSCH

TSAH

TSTH

TSTM

TSTMH

TSFH

TSF

TSC

ESM

ES30

User’s Guide

2

UNPACKING AND SETTING UP

1. Carefully unpack the stand and inspect for any damage. In-

spect the contents to ensure that you have received a test
stand complete with all accessories – see “List of included
items” section.


2. Install the loading lever into the hub on the ES10 stand or

install the handwheel on the ES20 stand.


3. Place the stand on a firm, flat and level working surface free

from vibration to ensure accurate readings. If preferred, the
test stand can be secured to a work bench with two screws or
bolts through the two clearance holes in the base – see
“Operation” section for further details.

Quantity

Item

1

Force measurement stand, ES10 or ES20

1

User’s guide (this booklet)

4

Thumb screws for gauge mounting

1

Mounting hole drill template

LIST OF INCLUDED ITEMS

Optional dial indicator kit ES001

The dial indicator kit, ES001, clamps onto the column of the
stand. The dial can be repositioned along the length of the
column.

It allows for 1.0” travel and provides a resolution of 0.001”.

Advertising
This manual is related to the following products: