Other test stands by mark-10, Unpacking and setting up, List of included items – Checkline ES05 User Manual
Page 3

Model ES05
5
OTHER TEST STANDS BY MARK-10
TST
TSB
TSA
TSCH
TSAH
TSTH
TSTM
TSTMH
TSFH
TSF
TSC
ESM
ES30
User’s Guide
2
UNPACKING AND SETTING UP
1. Carefully unpack the stand and inspect for any damage.
Inspect the contents to ensure that you have received a test
stand complete with all accessories – see List of Included
Items below.
2. Place the stand on a firm, flat and level working surface free
from vibration to ensure accurate readings.
3. Save original packaging materials in case future transporta-
tion is required.
Quantity
Item
1
Force measurement test stand
1
User’s guide (this booklet)
4
Thumb screws for gauge mounting
LIST OF INCLUDED ITEMS
Optional base plate 14-1068
Steel base plate has 25 #10-32 thread
holes for fixture mounting