Installation – Inovonics FA575 User Manual

Page 3

Advertising
background image

FA575 Installation Instructions

Page 3 of 4

Part 02888

Installation

Mounting repeaters:

Repeaters should be mounted in locations indicated by the system designer.

Do NOT mount repeaters on metal surfaces or inside metal enclosures. Do not
mount where sheet metal ductwork, wire mesh screens, etc. might unnecessarily
block transmissions. The FA575 housing has an inside knockout to permit wires
from power sources to be brought into the housing from behind the unit.

The repeater unit also has a removable shutter to permit wires to enter the hous-
ing from the side of the unit.

Power Supply:

The FA575 transformer requires an unswitched 120VAC power outlet.
(AC power must be supplied all of the time.)

The transformer case should be secured to the electrical outlet to prevent acci-
dental unplugging.

Recommended AC power requirement of repeater: 14VAC (only) at 20VA.
(ACC610)

Recommended backup power requirement (optional): 12 VDC, 1.2 Ah.
(BAT603) Note that ACC640 Receiver Enclosure or equivalent is needed to
mount the battery and receiver.

Recommended wire requirements: 2-conductor 20AWG (or larger) stranded
tinned copper with PVC insulation rated to 300 volts @ 80°. (Belden #8205, for
example.) Maximum recommended wire length between transformer and
repeater: 100 meters (328 feet). Measure voltage at repeater on long wire runs.
(Source: Tech Note #1053)

Wire runs should be hidden or protected by conduit.

Wiring knockout

Wiring shutter

Mounting holes

(4 places)

AC

BATTERY

TEST

DECODE

TRANSMIT

NOT ACTIVE

AC

AC

B+

B-

OUT

RESET

GND

RESET

AC Transforme

Backup battery

(optional)

Not used

Test Butto

Reset Button

Programming header

External terminal (optional use with exterior enclosure)

Advertising