INITIAL START-UP

27. Once the oxygen level is within the specified

range at 80%, lower the firing rate to 60%
and select VFD parameter 64. The oxygen
level at the 60% firing rate should be as
shown below.

Combustion Oxygen Level at

60% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

6.3 %

<50 ppm

<30 ppm

28. Adjust the oxygen level as necessary to

obtain the required reading at the 65% firing
rate.

29. Next, set the firing rate to 45% and select

VFD parameter 63. The oxygen level at the
45% firing rate should be as shown below.

Combustion Oxygen Level at

45% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

7.0 %

<50 ppm

<30 ppm

30. Adjust the oxygen level as necessary to

obtain the required reading at the 45% firing
rate.

31. Next, set the firing rate to 30% and select

VFD parameter 62. The oxygen level at the
30% firing rate should be as follows:

Combustion Oxygen Level at

30% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

7.0 %

<50 ppm

<30 ppm

32. Adjust the oxygen level as necessary to

obtain the required reading at the 30% firing
rate.

33. Finally, reduce the firing rate to 16% and

select VFD parameter 61. The oxygen level
at the 16% firing rate should be as shown in
the following tabular listing:

NOTE

At a 16% fire rate, if parameter 61 is
above 326, the VFD software will use 326
by default. 326 corresponds to a signal
output of 3.26 volts.

Combustion Oxygen Level at

16% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

8.0 %

<50 ppm

<30 ppm

34. Adjust the oxygen level as necessary to

obtain the required reading at the 16% firing
rate.

35. This completes the Natural Gas combustion

calibration procedures.

IMPORTANT

Refer to Appendix K for switchover
instructions when changing from Natural
Gas to Propane or from Propane to
Natural Gas.

4.4 PROPANE COMBUSTION
CALIBRATION

The Benchmark 1.5LN Dual-Fuel Boiler is
combustion calibrated at the factory prior to
shipping. However, recalibration as part of initial
start-up is necessary due to changes in the local
altitude, gas BTU content, gas supply piping and
supply regulators. Factory Test Data sheets are
shipped with each unit. These sheets must be
filled out and returned to AERCO for proper
Warranty Validation.

It is important to perform the following procedure
as outlined. This will keep readjustments to a
minimum and provide optimum performance.

1. Open the water supply and return valves to

the unit and ensure that the system pumps
are running.

2. Open the propane supply valve(s) to the

unit.

3. Set the control panel ON/OFF switch to the

OFF

position.

4. Turn on external AC power to the unit. The

display will show LOSS OF POWER and the
time and date.

5. Set the unit to the Manual Mode by pressing

the AUTO/MAN key. A flashing Manual Fire
Rate

message will be displayed with the

present rate in %. Also, the MANUAL LED
will light.

6. Adjust the fire rate to 0% by pressing the ▼

arrow key.