2 - instructions for installers, 1 introduction, 2 installation instructions – AERCO Modulex High Pressure Manual User Manual

Page 17: Instructions for installers, Installation, operation & maintenance

Advertising
background image

INSTALLATION, OPERATION & MAINTENANCE

2-1


INSTRUCTIONS FOR INSTALLERS

2.1 INTRODUCTION

The Modulex Boiler is intended to be installed as a Category IV vent installation and must be installed
in compliance with all applicable laws and regulations including the ones below. See section 3.1 for
Category descriptions.

Before boiler installation, complete all of the following
instructions:


The installation must conform to the requirements of the authority having jurisdiction or, in the absence
of such requirements, to one of the following:

• United States - Installation must conform to the requirements of the National Fuel Gas Code,

ANSI Z223.1 Installation Codes.

• Canada - Installation must conform to the requirements of CAN/CGA B149 Installation Codes.


Where required by the authority having jurisdiction, the installation must conform to the Standard for
Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1.

NOTES:

• Installers must follow local regulations with respect to installation of Carbon

Monoxide (CO) Detectors. Also, follow the maintenance recommendations in this
manual.

FOR MASSACHUSETTS INSTALLATIONS: The boiler must be installed by a

plumber or gas fitter licensed within the Commonwealth of Massachusetts.

Also, for installations in buildings used for residential purposes, if a side-wall vent
termination is less than 7 feet above grade, an NFPA 720 compliant, ANSI/UL 2034
listed and IAS certified carbon monoxide detector must be installed on the floor level
where the boiler is installed and on each level of the building served by the boiler.

2.2 INSTALLATION INSTRUCTIONS

The following paragraphs in this Section provide the instructions to unpack and install the Modulex Boiler.

2.2.1 Unpacking the Boiler

The Modulex Boiler is delivered assembled and protected by a plastic bag inside a rugged cardboard
box, which is fixed on a pallet (see Figure 2-1). The pallet allows the boiler to be handled by a forklift or
pallet jack. The boiler, with the packaging, can fit through a doorway of 32 in. (81 cm), whereas, without
packaging, it can fit through a doorway of 28 in. (71 cm). To unpack the Modulex, remove both straps
and then the cardboard box from above. Check to ensure that the product is intact.

2

The packing elements (cardboard box, straps, plastic bags, etc…)
must not be left in children’s hands since they may be dangerous.

Advertising