Awntech SanFrancisco Series User Manual

Page 3

Advertising
background image

STEP 7: Additional parts Hypotenuse (NC) and Wall Supports or Projection Bar
Assembly (WS or PA) are provided for extra support

STEP 8: Install additional NC to complete the frame assembly
STEP 9: Wall Supports or Projection Bar Assembly (WS or PA) are installed

only if needed after the Awning is hung on the wall




INSTALLING THE COVER

STEP 10: Slide the bead at the top of the fabric into the C-Channel at the top of
(TB).
STEP 11: Pull the remainder of fabric over the frame with the valance hanging

down below the (NC) and (FB) bars.
STEP 12: Once you are satisfied with the position of the cover on the frame,
wrap the Velcro strips on the fabric tabs around the exterior bars. Pull the tabs
snugly and attach them to the pre-installed Velcro tape on the bars.



POSITIONING THE BRACKETS CORRECTLY ON THE WALL

*** all the sizes are in inches

Model

Space

between

TB and P

Height

incl

valance Projection Model

Space

between

TB and P

Height Projection

RF22 24 31 24

RF22-NV 24 24 24

CF32 36 44 24

CF32-NV 36 36 24

CF33 36 44 36

CF33-NV 36 36 36

CF34 36 44 48

CF34-NV 36 36 48

CF43 48 56 36

CF43-NV 48 48 36

CF44 48 56 48

CF44-NV 48 48 48

EF2442 18

24

42 EF2442-NV 24 24

42

EF12 8 12 24

EF12-NV 12

12 24

EF1836 12

18

36 EF1836-NV 18 18

36

EF1230 8

12

30 EF1230-NV 12 12 30

EF1030 10

16

30 EF1030-NV 16 16

30

EF23 18 24 36

EF23-NV 24 24 36

EF24

18

24

48

EF24-NV

24

24

48


STEP 13: Place the awning on the wall and make adjustments to choose the ideal
location. Mark the bottom of the frame after you have centered it on the opening
that you are covering.
STEP 14: Using a pencil and a level, mark a horizontal line as wide as your
awning at that height. Verify that it is centered on the space.

Advertising