2

BGA Series Shutoff Gas Valve Installation Instructions

6.

The BGA Series valve may be mounted on a
horizontal manifold with the solenoid coils pointed
up (vertical) or in any position not exceeding 90

°

from the vertical. The valve may also be mounted
on a vertical manifold in any position around its
axis (see Figure 1). Do not install the solenoid
coil upside down. Install vertically wherever
possible.

90° Maximum
from Vertical

90° Maximum

from Vertical

Limited Horizontal and Vertical

Vertical mounting may be

360º around its axis

with the gas flow either

up or down.

Figure 1: BGA Series Mounting Positions

7. Installer must be a trained, experienced, flame

safeguard control technician. Threads of the pipe
and nipples must be smooth and free of tears and
burrs. Steam clean all piping to remove foreign
substances such as cutting oil or thread chips. A
sediment trap should also be installed in
accordance with the National Fuel Gas Code
NFPA 54 (see Figure 4). Mount the valve to the
pipework, use a quality rated pipe tape, UL listed
seal material rated for gasoline, propane, and
other gases. If not available, a quality grade pipe
dope, a light amount on the male threads, starting
two threads away from the first engaging thread. If
pipe dope lodges on the valve seat, it will prevent
proper closure. Remove excess compound after
mounting the valve to the pipework.

!

WARNING:

Risk of Explosion or Fire.

Verify that there are no gas leaks by testing with
appropriate equipment. Never use a match or lighter
to test for the presence of gas. Failure to test
properly can lead to an explosion or fire and may
result in severe personal injury or death.


8. Check for leakage:

a. Shut off the gas at the main manual shutoff

valve and open the pressure connection
between the manual shutoff valve and the
BGA Series valve.

b. Connect air tubing with a maximum pressure

of 1-1/2 times the valve’s maximum operating
pressure (as indicated on the valve) to the
opened pressure connection.

c. Paint all valve body connections with a rich

soap and water solution.
If bubbles occur, this is an indication of a leak.
To stop a leak, tighten joints and connections.
Replace the part if the leak cannot be stopped.
If bubbles do not occur, remove the air tubing
and close the pressure connection.

9. Make wiring connections. Refer to the Wiring

section for specific wiring instructions.

10. Perform the Checkout section before leaving the

installation.