Carrier 48ZT User Manual

Page 2

Advertising
background image

2

10. Using the scrolling marquee, enable the unit to run using

the following procedure:

a. Push the

key unit a blank display screen

is shown.

b. Push the

key until the SERVICE TEST LED is

lit.

c. Push the

key. The display will show

STOP.

d. Push the

key again. The NO/YES display

will flash.

e. Push the

or

key to toggle the display to NO

and then push

. The unit will return to

normal operation and exit SERVICE TEST mode.

11. To test the operation of the gas section, use the scrolling

marquee Service Test routine to energize the gas outputs

and to turn on the gas. Refer to the unit Controls, Start-

Up, Operation, Service and Troubleshooting literature for

more information.

12. For normal operation, make sure that units with a conven-

tional thermostat are set to heating control temperature.

On VAV (variable air volume) and constant volume units

with a space temperature sensor, make sure that the set

points are at the normal heat set points.

ESCAPE

ENTER

ENTER

ENTER

If the main burners fail to light, or the blower fails to come

on, shut down gas heating section and call your dealer for

service. Failure to follow these requirements could result in

serious personal injury.

Fig. 1 — Heat Section Details

NOTE: High heat consists of sections 1-3. Low heat consists of
sections 1 and 2 only.

055-105 SIZES

NOTE: High heat consists of sections 1 and 2. Low heat consists
of section 1 only.

030-050 SIZES

Advertising
This manual is related to the following products: