Blinds Chalet Top Down Bottom Up Installation User Manual

Page 2

Advertising
background image

H

OW TO

O

PERATE

Y

OUR

S

HADE

The brackets are

mounted with two bugle

head

screws through the

back end of the

bracket flat against

the window molding

or the wall above the

window. The bracket

requires a minimum

surface 3/4" high.

O

UTSIDE

M

OUNT

Optional Extension Brackets are used to project the back

of the shade up to 2 3/8" from the mounting surface. Attach

the Installation Bracket to the Extension Bracket with the

nut and bolt provided.

O

PTIONAL

E

XTENSION

B

RACKETS

2 1

/2"

3/4"

2 1/2

"

Extension

Bracket

2 1/2" minimum

Nut

Bolt

Unwind the cord from the shade but keep the rubber

band around the shade stack.

1. Hold the shade up near the brackets and insert the front clip of

the bracket into the front groove of the rail.

2. Make sure the shade is centered in the window opening.

3. Push the rail back and up until the back clips of the bracket

are inserted in the back groove of the rail.

To remove shade, reverse procedure.

H

ANGING THE

S

HADE

For shades ordered as Two-on-One Headrail using

the Splicer piece, insert Splicer in Headrail of both

shades as shown. Lock into place using 3/8" Tek

Screws provided.

T

WO

-

ON

-O

NE

H

EADRAIL

S

PLICER

O

PTIONAL

H

OLD

D

OWN

B

RACKET

Aluminum

Splicer Piece

6"

3"

11/2

" to

2"

3/8" Tek Screw

Optional Hold Down Brackets are mounted with

the supplied screws. With the shade at its proper

drop, place the pin of each Hold Down into the

hole in each End Cap and mark the screw holes.

Make sure the pins

are level and aligned.

Raise the shade,

then screw the Hold

Down Bracket into

the mounting

surface.

Assembled Cross Section

Head Rail

Splicer

Stiffener

Fabric

C

ORDLOCK

O

PERATION

To raise or lock either the middle rail or bottom rail

of the shade, pull the cord down and inward to the

center of the shade.

NOTE: When raising the

middle rail all of the way

to the head rail, you

should raise the bottom

rail a couple of inches.

This will prevent pinching

the equalizer between the

rails.

To lower or release either

the middle rail or bottom

rail of the shade, pull the

cord directly downward in the vertical position to

release the lock.

Pull cord down, raising Bottom Rail to lower

Equalizer so it will not get caught between the

Head Rail and the Middle Rail. Do this prior to rais-

ing the Middle Rail.

On a standard Top-Down/Bottom-Up shade, the right

hand cord operates the middle rail, while the left hand

cord operates the bottom rail.

1. Line up the bracket top

with the desired height

of the top of the head-

rail.

2. Mark holes for

screws. Brackets

must be level.

Remove brackets

and drill holes.

3. Insert bugle head

screws for keyhole

slots only.

Approximately

1/8" of the screw

should be left protruding.

4. Pull the cord

lock assembly

partially out of

the headrail

and slide the bracket on as shown. Push the cord

lock as assembly and bracket back all the way

into the rail.

5. Remove the endcap from the opposite end of the

headrail. Slide the remaining side mount bracket

on the headrail. Replace the end cap before slid-

ing the bracket all the way into the headrail.

S

IDE

M

OUNT

B

RACKET

I

NSTALLATION

Rail

6. Hook one bracket onto the screw in the window frame,

using the keyhole slot. Bring the other end bracket

over the screw at the other side of the frame. Slide

down, flexing bracket inward until the screw engages

in the keyhole slot.

7. Make sure both brackets are slipped down all the

way in the keyhole slot so that the screw is in the

top portion of the keyhole slot. Install a screw in

the bottom hole of each bracket. Tighten all

screws.

Advertising