Blinds Chalet Tavarua Exotic Bamboo Ring Drapery User Manual

Page 2

Advertising
background image

NOTE: For wallboard or plaster, use anchors designed for hollow walls
(not included). For concrete, stone and brick, use a masonry drill bit and
anchors designed for masonry (not included).

FOR OUTSIDE OR WALL MOUNT:

1. Position brackets 1 to 2 inches from the end

of the head rail. If provided, position middle
brackets to align with pre-drilled holes
in the head rail.

2. Hold the shade in place and mark the

desired bracket locations with a pencil.
Use a level to ensure the brackets are straight.

3. Pre-drill the mounting holes into the

mounting surface. Next, screw the
brackets in place into the mounting
surface.

[figure 1]

4. Hold the shade so that the screw posts

on the brackets fit through the slots in
the head rail and re-attach wing nuts and
screw tight to hold the head rail firmly.
Make sure the shade is level.

[figure 2]

FOR INSIDE OR CEILING MOUNT:

1. Position brackets approximately 1 inch from the

ends of the head rail. If provided, position middle
brackets to align with pre-drilled holes in the
head rail.

2. Measure 1 inch in from each side of the

window frame and mark bracket locations
with a pencil.

3. Pre-drill the mounting holes into the mounting

surface. Next, screw the brackets in place into
the mounting surface.

[figure 3]

4. Hold the shade so that the screw posts on the

brackets fit through the slots in the head rail
and re-attach wing nuts and screw tight to hold
the head rail firmly. Make sure the shade is level.
[figure 2]

INSTALLING THE CORD CLEAT:

Optional. Your shade is fitted with a cord lock,
which allows the shade to stay in whatever
position you desire. However cord cleats help
keep cords tidy and away from children.

We

strongly recommend the use of cord cleats
to help prevent the risk of strangulation.

1. Find a convenient place about 1 inch out from

the side of the shade where the cords are
located and about one quarter of the way
up from the bottom of the shade.

2. Hold the cord cleat parallel with the frame of

the window. With a pencil, make a mark through
the holes.

3. Make pilot holes and install cord cleat with

2 screws.

INSTALLATION:

[figure 3]

[figure 2]

head rail

TOOLS THAT MAY BE REQUIRED:

Pencil, Tape Measure, Screw Driver, Step Stool, Level, and Drill

- - - - -

- - - - -

[figure 1]

Advertising