Assembly, Caution, Remove the generator from the shipping carton – Champion Power Equipment 100107 User Manual

Page 11: Install the wheel kit, Install the support leg, Connect the battery

Advertising
background image

REV 100107-20140923

8

100107

ENGLISH

Your generator requires some assembly. This unit ships
from our factory without oil. It must be properly serviced
with fuel and oil before operation.
If you have any questions regarding the assembly of your
generator, call our help line at 1-877-338-0999. Please
have your serial number and model number available.

Remove the Generator from the Shipping Carton

1. Set the shipping carton on a solid, flat surface.
2. Remove everything from the carton except the

generator.

3. Carefully cut each corner of the box from top to

bottom. Fold each side flat on the ground to provide a
surface area to install the wheel kit and support leg.

Install the Wheel Kit

You will need the following tools to install the wheels:
• 17 mm wrench OR adjustable wrench (not included)
• Socket wrench with a 16 mm socket (not included)
• Pliers (not included)

1. Before adding fuel and oil, tip the generator on it’s side.
2. Slide the flange bolt (M10x120) through the flat

washer, bushing and wheel.

3. Slide the bolt through the mount point on the frame.
4. Fasten securely with the M10 lock nut.
5. Repeat steps 2-4 to attach the second wheel.

Install the Support Leg

1. Attach the support leg to the generator frame with

flange bolts (M8x16) and flange lock nuts (M8).

2. Tip the generator slowly so that it rests on the

wheels and support leg.

The wheel kit is not intended for over-the-road use.

CAUTION

ASSEMBLy

Connect the Battery

1. Remove the protective cover from the red (+) lead on

the battery.

2. Attach the red (+)lead to the red (+) terminal on the

battery with the cap screw (M5x10) and secure with
the lock washer (M5)

3. Repeat steps 1-2 for the black (–) battery lead.

Advertising