E final check list, Operation check list, Installation instructions – GE EER2000 User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

E Final Check List

□ Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.

□ Be sure power is in service to the building.

□ Check to be sure that all packing materials and tape on metal panel (if applicable) under

control knobs have been removed.

^ Operation Check List

□ Check to make sure the Clock display is energized. If a series of horizontal red lines appear

in the display, disconnect power immediately. Recheck the range wiring connections. If
change is made to connections, retest again. If no change is required, have building wiring
checked for proper connections and voltage. It is recommended that the clock be changed if

the red lines appear.

□ Push in and turn any one of the four surface knobs to “MED” setting to observe that the

element glows within 60 seconds. Turn the knob off when glow is detected. If the glow is not
detected within the time limit, recheck the range wiring connections. If change is required,
retest again. If no change is required, have building wiring checked for proper connections
and voltage.

11

Advertising