EVCO EVF204N9 User Manual

Page 8

Advertising
background image

EVCO S.p.A.

This document belongs to Evco; unless you are authorized by Evco, you cannot publish this document.

Via Mezzaterra 6, 32036 Sedico Belluno ITALY

Evco does not take any responsibility about features, technical data and possible mistakes related in this document.

Phone +39-0437-852468 • Fax +39-0437-83648

Evco does not take any responsibility about damages coming by the non-observance of additional information.

[email protected] • www.evco.it

Evco reserves the right to make any change without prior notice and at any time without prejudice the basic safety and operating features.

Evco S.p.A. • Code 104F204E00 • page 8/8

13

ELECTRIC CONNECTION

13.1

Preliminary considerations

With reference to the wiring diagram:
• the utility managed by the fourth output will depend on parameter u1
• the serial is the port for communication with the Parameters Manager set-up software system or to the monitoring and supervision system of RICS plants (through a serial interface, via TTL, with MODBUS communication

protocol) or with the EVKEY programming key. The port must not be used simultaneously for three purposes.

13.2

Electric connection

13.3

Recommendations for the electric connection

• do not operate on the terminal boards using electric or pneumatic screwdrivers
• if the instrument has been taken from a old place to a hot one, the humidity could condense inside. Wait about one hour before applying power
• make sure that the power supply voltage, frequency and operational electric power correspond to those of the local power supply
• disconnect the power supply before performing any type of maintenance
• do not use the instrument as a safety device
• for repairs and information regarding the instrument, contact the Evco sales network.

Advertising