Installation – Fawcett EGD Sanitary Flange Series User Manual

Page 4

Advertising
background image

FAWCETT Co, Inc.

SW EGD manual

04/06

page 4 of 6

Installation

Your new mixer is supplied partially assembled. For
more information, see the parts list pages for general
arrangement drawings.


Blades:
To install the Turbine blades, back off the set screw as
far as possible without removing them. Insert mixing
shaft into the bore and tighten the set screw firmly to
secure the Turbine blades to the shaft.




Blade Placement:
Experimenting with Turbine blade placement will
provide your best results.




Assembly:

1.) Assemble mixing shaft to the coupling.
2.) Assemble the Turbine blades as described

above.

3.) Assemble the mixer to the mixer lift bracket

using bolt supplied.

4.) Adjust the mixer to the desired angle and

tighten the bolt.

5.) Wire mixer in accordance with instructions on

pages 2 & 3 of this manual.



Mixer is now ready to operate.

































Advertising