Build the fuselage – Great Planes Ultra Sport 40 Plus Kit - GPMA0390 User Manual

Page 24

Advertising
background image

5. Locate the die-cut wing dowel plate (WDP) and

center it between ribs W2 as shown above. Once satisfied
with the fit, glue it in place with epoxy. The die letters on the
part should be right side up.

6. Drill a 1/4" [6.4mm] hole through DP where the holes

on WDP are as shown above. Drill into the wing joiner 3/32"
[2.4mm]. To do so, apply some masking tape to the 1/4"
[6.4mm] drill bit 1-13/16" [46mm] away from the end and drill
until the tape reaches the wing dowel plate.

7. Locate the 1/4" x 5" [6.4mm x 127mm] wing dowel. Cut

it in two 2-1/4" [57mm] long dowels. Round the edges of
the dowels.

8. Mix a small amount of epoxy and glue the dowels in

place as shown above. It is important that these dowels are
properly glued. Make sure that there is enough epoxy in all
the holes. After the dowels are installed, use a brush to
apply some more epoxy around the holes and the dowels
inside the wing.

❏ ❏

1. Unroll the plan sheet. Roll it inside out so they will

lie flat.

❏ ❏

2.Position the fuselage plan flat on the building board.

Cover the plan with Great Planes Plan Protector or waxed
paper so glue will not adhere to it.

❏ ❏

3. Locate the two die-cut 1/8" [3.2mm] lite-ply fuselage

side doublers (FSD). At the front of each FSD there is a
notch with two additional slits. On one FSD only, draw a line
from the end of each slit. Cut on the line using a hobby knife
and mark this FSD as “Right.” Mark the other FSD as “Left.”

Note: You will begin building the right side fuselage. Make
sure you do not build two right sides. The forward fuselage
side (FFS)
with the deeper notch is the right side of the
fuselage. This is important. The deeper notch on the right

BUILD THE FUSELAGE

24

Advertising