Crown Boiler 16-325 500506 User Manual

Page 6

Advertising
background image

6

Figure 2: Minimum Clearances to Combustibles

4

All Models - The following service clearances are recommended from the top and front of the boilers:

16-325, 16-390 – 24 inches
16-455, 16-520, 16-585 – 48 inches

These clearances may be reduced to those shown in Table 2, however servicing the boiler will become increas-
ingly difficult as these service clearances are reduced.

3) The boiler must be installed on a hard level surface.
4) Do not install this boiler in a location where gasoline or other flammable vapors or liquids will be stored or used.

Do not install this boiler in an area where large amounts of airborne dust will be present, such as a workshop.

5) The boiler should be located as close to the chimney as possible.
6) Do not install this boiler directly on a surface that may get wet. Raise the boiler on a pad.

Table 2: Minimum Clearances From Boiler To Combustible Material (inches)

Boiler Model

Front

Top

Sides

Rear

16-325 & 16-390

18

36

6

6

16-455, 16-520, 16-585

18

51-1/2

6

6

Clearance between adjacent Series 16 boilers in modular or multiple boiler installation = 1”

Advertising