Save these instructions, Maintenance (continued), Intex – Intex ZS8110 Saltwater System User Manual
Page 18

(187PO) MODEL ZS8110 OZONE & SALTWATER SYSTEM ENGLISH 7.5” X 10.3” PANTONE 295U 06/28/2013
187
PO
SAVE THESE INSTRUCTIONS
English
Page 18
MAINTENANCE (continued)
The 3-Way Test Strips can test the “Free Chlorine”, “pH”, and “Total Alkalinity” levels at the
same time. We recommend that you test the water chemistry weekly, and maintain the chlorine
concentration at 0.5-3 ppm.
Directions and Use
1. Dip the entire strip into the water and remove immediately.
2. Hold the strip level for 15 seconds. Do not shake excess water from the strip.
3. Now compare the strip pad to the color chart on the packaging label. If necessary, adjust
the chemical level in the pool water. It is very important, to use the proper technique when
testing the water's chemical level. Read and follow the written strip instructions carefully.
1. Disconnect the power cord from the electrical outlet.
2. After the pool is completely empty, disconnect the Ozone & Saltwater System from the
hoses by reversing the installation instructions.
3. Air-dry the unit before you store it. This might be a good time to visually inspect and clean
the electrolytic cell.
4. Store the unit and accessories in a dry place. The temperature should be controlled,
between 32 degrees Fahrenheit (0 degrees Celsius) and 97 degrees Fahrenheit (36
degrees
Celsius).
5. The original package can be used for storage.
INTEX
®
3-WAY TEST STRIPS
(PACKED WITH THE PRODUCT)
LONG TERM STORAGE
4. In a counter-clockwise motion, unscrew the Titanium electrode nut (4). Pull out the Titanium
electrode
(5).
5. Pour kitchen grade vinegar into a mug to immerse the titanium plates. Soak them for about
one hour and then flush with a garden hose.
6. Reverse steps 3 and 4 to replace the Titanium electrode (5).