Back sl id e – Jaypro Sports FNFB-30 User Manual
Page 4
Advertising

Rev: -
Page 4 of 8
Install Pole Hardware:
The pole is assembled prior to lifting into the ground sleeve.
Assemble 3/8” eyebolt hardware & 1/4" cleat hardware and pole cap onto the poles as
shown in Figure 3 & 4. Route the hoisting rope through the pulley. Attach the snap hook
to the hoisting rope with a bowline knot. Temporarily attach the free end of the hoisting
rope to the snap hook.
HOISTING ROPE x 65 FT LONG (BOW LINE KNOT)
Figure 3
3/8" FLAT WASHER
STAINLESS STEEL
6 5/8 ID BLACK CAP
3/8"-16 HEX HD LOCKNUT
2'' SWIVEL PULLEY
3/8” QUICK LINK
STAINLESS STEEL
HOISTING ROPE x 85 FT
LONG (BOW LINE KNOT)
3/8" FLAT WASHER
STAINLESS STEEL
TOP OF POLE
5/16" x 3 1/8" SNAP HOOK
~
Back
sl
id
e
~
TEMPORARILY TIE ROPES
TOGETHER
Advertising