Installing the Jaypro Max-1 Football Goal Posts

www.jaypro.com

JSL-Inst015

Rev20110223

9

c. Skip ahead to section 9 if you are installing the gooseneck w/o ground

sleeve.

Note: If you are unable to excavate a clean hole due to soil conditions, excavate a
wider hole, install a 36” diameter Sonotube, and backfill the Sonotube.

2. Pack the bottom of the footing hole with 12-1/4 inches of gravel or concrete

block or pour a 12-1/4-inch deep concrete pad and allow the concrete pad to
cure for 48 hours.


3. Lower the ground sleeve into the footing hole. With the standard ground sleeve,

the top of the ground sleeve should be exactly 1-5/8 inches below the ground
level.


4. While not required, Jaypro recommends using 6 lengths of 5/8-inch rebar,

54 inches long, wired together into a 24-inch diameter basket and placed
around the ground sleeve in the footer hole.


5. Ensure that the ground sleeve is plumb.

6. Ensure that the center of the ground sleeve opening is positioned exactly at the

point determined in Section 5.

7. Support the ground sleeve so it will not move while pouring concrete.

8. Fill the footing hole with 4,000 psi (minimum) concrete to 6 inches below ground

level.

9. Allow the concrete to cure for 48 hours before installing the crossbar and

uprights.