Jaypro Sports OCV-900 User Manual
Page 7

8) To remove the unit for storage, disconnect the net from the two uprights.
Carefully lift each upright from the floor sleeve top cap. Important: the uprights
are heavy and it is recommended that at least two people hold and lift each
upright from the floor sleeve.
INSTALLATION AND USE CONSIDERATIONS
1) This unit is designed for high-level competition play. Consequently, when
installed and operational, the unit is subject to considerable stress loads. It is
essential to inspect all parts before each use.
2) Do not use this equipment without the protective upright padding properly
fastened in place.
3) A few drops of light lubricating oil applied periodically to the moving parts on the
cable buckle will help assure smooth and easy operation.
4) A light coating of lubricating grease applied to the inside of each floor sleeve will
make the removal of each upright easier.
SEMI-PERMANENT VOLLEYBALL STANDARDS
SLEEVE INSTALLATION INSTRUCTIONS
Set ground sleeves exactly 36’ on center. This may require the services of a qualified
local contractor familiar with the soil conditions and the building codes in your area. The
referenced minimum concrete dimensions are typical for average soil conditions, but
unusual conditions may warrant modifications by the contractor.
Important: Proper installation of ground sleeves is essential to the successful
performance of this unit.
Note: Concrete specified should be 4000# min. curing time should be a minimum of 14
days before putting it into service.